Rio Salado Pathway (South Bank)
       
     
02-Node-Color---Rendering.jpg
       
     
03-work-rio-salado-mesa.jpg
       
     
04-web-panel-day.jpg
       
     
05-node-4r.jpg
       
     
06-web-panel-night.jpg
       
     
07-Tree-Node---Rendering.jpg
       
     
08-Portal-2---Rendering.jpg
       
     
09-Node-Copper---Rendering.jpg
       
     
10-web-portal-accd-day.jpg
       
     
11-web-color-portal-night.jpg
       
     
Rio Salado Pathway (South Bank)
       
     
Rio Salado Pathway (South Bank)

Mesa, AZ  |  2015

Landscape Architect of Record: Tiffany Halperin, design lead

This project is the first segment in the City of Mesa’s section of a regional corridor that when complete, creates pedestrian and bicycle connection between the cities of Phoenix, Tempe, Scottsdale and Mesa. Located on the south bank top of the levee of the Salt River channel and adjacent to the Arizona Department of Transportation’s Loop 101/202 interchange it utilizes the unimproved levee as a maintenance drive and a shared-use path with safety railing, lighting, habitat observation overlooks, and landscape enhancements. It transforms a multi-jurisdictional zone into a commuter route without impeding the capacity of the Salt River channel.  The landscape architect teamed with T.Y. LIN for this segment and the project is on-going.

Highlights:  Multi-Use Path  |  Bicycle/Ped. Commuter Route  |  Urban Design  |  Placemaking  |  Pedestrian Connectivity  |  404 Waterway  |  Riparian Habitat Restoration  |  MAG Design Assistance Program  |  Utility/Infrastructure Challenges  |  Many Agencies/Stakeholders

02-Node-Color---Rendering.jpg
       
     
03-work-rio-salado-mesa.jpg
       
     
04-web-panel-day.jpg
       
     
05-node-4r.jpg
       
     
06-web-panel-night.jpg
       
     
07-Tree-Node---Rendering.jpg
       
     
08-Portal-2---Rendering.jpg
       
     
09-Node-Copper---Rendering.jpg
       
     
10-web-portal-accd-day.jpg
       
     
11-web-color-portal-night.jpg